Tag Archives: 3 Cannon
Fall 2015 Service Enhancements [UPDATED 7/19]
Proposed changes for FALL 2015 are summarized below. These changes represent Phase 1 of the Ten Year (2015-2024) Local Transit Strategy. Phase 1, to be rolled out over three periods (September 2015, March 2016 & September 2016) is comprised of actions designed to address current system deficiencies by applying the limited additional vehicles and operators where we will get the best return on investment.
System deficiencies were identified by analyzing various data samples like schedule deviation and passenger loadings (among many other data sets). A sample of that data can be seen in the tables on the following pages. Additionally, input from Operations and the passengers was equally important and valuable.
Pan Am Closures Detour 3 CANNON from July 5th – 27th

Effective Sunday, July 5th, 2015 from 5:00AM until July 27th, 2015 at 6:00AM, Cannon Street East will be fully closed between Lottridge Street and Gage Avenue North. The closures are due to the 2015 PanAm Games and events hosted at Tim Horton’s Field which will require various road closures within the stadium’s immediate area.
Due to the closure, route 3 CANNON will be detoured in both directions.