Tag Archives: 3 Cannon

2016 Supercrawl Detours Sept 8th – 11th

detour_small

Supercrawl is taking place on the weekend of September 9-11, 2016. The event will result in the closure of the following streets:

  • James Street, between King Street (north leg) and Strachan Street
    Thursday, September 8 at 2:30 am until 4 am on Monday, September 12.
  • York Blvd., between Bay Street and Hughson Street
    Thursday, September 8 at 2:30 am until 4 am on Monday, September 12.

Labour Day Classic festivities at Tim Horton’s Field detour 3 CANNON on Labour Day 3-7pm

detour_small

Effective Monday, September 5, 2016 from 3:00 PM until 7:00 PM, Cannon Street East will be fully closed between Melrose Avenue and Balsam Avenue. The closures are due to the Labour Day Classic Festivities at Tim Horton’s Field.

Due to the closure, route 3 CANNON will be detoured in both directions.

2016 Open Streets Hamilton Event Detours Multiple Routes June 19th

detour_small

Open Streets Hamilton is taking place on Sunday, June 19th, 2016 from 10:00 AM to 6:00 PM and will result in the closure of James between York Blvd / Wilson Street and Strachan Street.

East/West cross traffic will be maintained by Hamilton Police at Cannon and Barton.

James Street North Nightly Closure – May 9-12 detours Routes 2/3/4

detour_small

There will be watermain tie-ins occurring at the development at James and Vine on weeknights from Monday, May 9th to Thursday, May 1th2 inclusive. The work will occur from 8:00 PM to 6:00 AM each night/early morning. As a result, James Street North will be closed between Vine Street and York Blvd. nightly.

Due to the closures routes 2 BARTON, 3 CANNON, and 4 BAYFRONT will be detoured.

James Street North Nightly Closure – April 18-22 detours Routes 2/3/4

detour_small

There will be watermain tie-ins occurring at the development at James and Vine on weeknights from Monday, April 18th to Friday, April 22nd each night. The work will occur from 10 pm to 6 am each night/early morning. As a result, James Street North will be closed between Vine Street and York Blvd. nightly.

Due to the closures routes 2 BARTON, 3 CANNON, and 4 BAYFRONT will be detoured.

James Street closure detours Multiple Routes on April 17th

detour_small

There will be sewer construction in front of 36 James Street South on Sunday, April 17th, 2016 that will result in the closure of James Street from King Street to Main Street between the hours of 7:00 am to 5:00 pm. All HSR routes that use this section of roadway will be on detour.

This includes 1 KING, 2 BARTON, 3 CANNON, 4 BAYFRONT, 6 ABERDEEN, 7 LOCKE, and 8 YORK.

1 KING detoured April 9th – 10th Downtown

detour_small

There will be a crane lift for the CIBC Tower on Saturday evening April 9th from approximately 8:00pm and early Sunday morning April 10th until approximately 4:00am that will result in the closure of one southbound lane of James Street South, south of the north branch of King Street. As a result, route 1 KING will be detoured.

Additionally bus stop JAMES at KING (serviced by 2 BARTON and 3 CANNON) will be temporarily relocated due to the lane restriction. All routes on James Street South (routes 2, 3, 4, 6, 7 and 8) should expect delays during the times of the crane lift.

Routes 1 KING will be detoured as follows:

Cannon Street Closure Detours 3 CANNON on February 6th

detour_small

Effective Saturday, February 6th, 2016 from approximately 8:00 AM to 5:00 PM, Cannon Street from Stirton Street to Birch Avenue will be closed due to a watermain repair. As a result, westbound route 3 CANNON buses will be on detour during this time. Eastbound buses travel via Wilson Street and will be unaffected.

Route 3 CANNON will detour as follows during this time.

Remembrance Day Detours November 8th, 2015

detour_small

There will be a procession for Remembrance Day on Sunday, November 8, 2015. The procession this year will return to the Cenotaph in Gore Park after last year being temporarily relocated to Liuna Station during Gore Park construction. A small procession will depart the James Street Armouries at 10:15 am and proceed south on James to the south side of King Street. The road closures in the surrounding area of the Cenotaph should begin around 10:30 am.

The ceremonies will begin at the Cenotaph at 10:45 am and will continue until 11:30 am. During this time, there will be no vehicle traffic allowed on the following streets:

  • King Street (North Side) – Catharine to James
  • Hughson Street – King to Main
  • John Street – King to Main

There will be two minutes of silence observed at 11:00 am, at which time all traffic (including buses) in the surrounding area will not be permitted to move.

All of the MacNab Terminal routes will service the Route 5 bus stop on Main at MacNab.

2015 Supercrawl Detours Sept 11th – 13th

hsr_bus_lane_sign

Supercrawl is taking place on the weekend of September 11, 12 & 13, 2015. The event for this year has been extended to include James Street between King and Main. A summary of the associated road closures is below:

  • James Street, between Main and King Street (north leg) >> Thursday, September 10th at 6 PM until 1:00 AM on Monday, September 14th
  • James Street, between King (north leg) and Murray >> Friday, September 11th at 10:00 AM until 1:00 AM on Monday, September 14th
  • York Blvd.,/Wilson Street between Bay Street and Hughson Street >> Friday, September 11th at 10:00 AM until 1:00 AM on Monday, September 14th
  • A bus only lane, complete with barricade fencing, will be enforced on King Street, between John and MacNab >> Friday, September 11th at 10:00 AM until 1:00 AM on Monday, September 14th

The below detours are for Friday morning. Click here for the detours effective Thursday evening and overnight.

Additionally the HSR will be providing a free shuttle between the Locke Street Festival and Supercrawl during the festival. Click here for shuttle information.