Road 2 Hope Marathon Detours Multiple Routes on November 6th [ UPDATED ]

detour_small

The Road2Hope marathon takes place on Sunday, November 6th, 2016. The marathon consists of a full and a partial marathon, each resulting in separate road and lane closures.

The full marathon (42 km) starts at Dofasco Park (1st Road East, south of Green Mountain Road) in upper Stoney Creek at 8:00 AM. The runners proceed north on Third Road East, east on Green Mountain Road, north on Tapleytown Road, east on Ridge Road, south on Fifth Road East, west on Highland Road, north on Albion Road, north on the Red Hill Valley Parkway exiting at Barton Street. The runners will continue west on Barton Street and enter the Red Hill rail trail just west of the southbound off ramp. The runners will remain on the rail trail, take the new bridge over the QEW and exit at Van Wagners Beach Blvd. Runners will cross the street near Confederation Park and proceed to the Beach Trail (Burlington bound). Runners will exit onto Beach Blvd. near Van Wagners and continue northwest (Burlington bound) on the lake side of Beach Blvd. The runners will then enter the Beach trail near Eastport Drive and return via the Beach trail to Confederation Park.

The half marathon (21 km) starts at Dofasco Park at 8:15 AM.

The following road and lane closures that will affect HSR will be in effect while the race is in progress:

  • Red Hill Valley Parkway (downbound lanes only) from Mud Street to Barton Street, approximate times 7:30 AM to 12:30 PM
  • Beach Boulevard (one Burlington bound lane) from Woodward Avenue to Eastport Drive from approximately 8:45 AM to 1:00 PM.

Delays can be expected, perhaps severe, at the following locations:

  • Barton Street – Race participants will exit the RHVP, cross to the furthest north westbound lane and enter the Red Hill trail just west of the southbound off ramp. Police will assist participants in crossing from the south side to the north side of Barton Street from approximately 8:30 to 11:15 am.
  • Upper Centennial Parkway – Race participants will cross at Highland Road from approximately 8 to 9:45 am.
  • Stone Church Road – Race participants will cross at the Upper Red Hill Valley Parkway (Stone Church on ramp to RHVP northbound) from approximately 8 to 9:45 am.

As a result, routes 11 PARKDALE and 43 STONE CHURCH buses will be detoured.

Lane Restrictions along James Mountain Road could cause delays to routes 20/21/33/35 thru October 28th

caution_bus_sign

To safely complete a repair of the barrier wall, traffic along James Mountain Road will be reduced to one lane from 9:00 AM to 3:00 PM throughout this week.

The road will be open to up-bound and down-bound traffic and will be controlled by signs and flags. The lane restrictions begin today and are expected to wrap up by Friday, October 28th, 2016.

Mohawk College Transit Terminal to Open on March 27th

MohawkCollegeTransitTerminal

The new Mohawk College Transit Terminal is scheduled to open on March 27th, 2016. Southbound and Northbound buses on routes 20 A-LINE EXPRESS, 21 UPPER KENILWORTH and 33 SANATORIUM will actually service inside the Terminal. Only the Northbound 35 COLLEGE will service inside the Terminal. Southbound 35 COLLEGE buses will use the stop area on West 5th Street just north of the Mohawk College Transit Terminal entrance.

Bus stops inside the terminal will indicate the route and direction. Enhanced shelters and bus stop areas are currently being installed in the terminal area.

Mohawk College Closure Detours 35 COLLEGE on August 8-9

detour_small

Effective Saturday, August 8, 2015 from approximately 7:00am until Sunday, August 9, 2015 at approximately 7:00pm the access road to the front doors of Mohawk College from the West 5th & Governor’s Blvd intersection will be closed due to construction.

As a result, route 35 COLLEGE will be on detour and will not service the Mohawk College directly.

Fall 2015 Service Enhancements [UPDATED 7/19]

Proposed changes for FALL 2015 are summarized below. These changes represent Phase 1 of the Ten Year (2015-2024) Local Transit Strategy. Phase 1, to be rolled out over three periods (September 2015, March 2016 & September 2016) is comprised of actions designed to address current system deficiencies by applying the limited additional vehicles and operators where we will get the best return on investment.

System deficiencies were identified by analyzing various data samples like schedule deviation and passenger loadings (among many other data sets). A sample of that data can be seen in the tables on the following pages. Additionally, input from Operations and the passengers was equally important and valuable.

James Mountain Road Closure May 23-24 Weekend Detours Routes 21/33/35 (Unconfirmed)

detour_small

This weekend, the James Mountain Road escarpment access (West 5th Street/James Street South) will be closed to accommodate ongoing construction as part of the West 5th Street project. The closure is required so crews can safely complete retaining wall work along the escarpment access.

The access will be closed on Saturday, May 23rd and Sunday, May 24th between 8:00 a.m. and 5:00 p.m.

As a result, routes 21 UPPER KENILWORTH, 33 SANATORIUM and 35 COLLEGE will be on detour during these times.

PLEASE NOTE THAT THE CITY OF HAMILTON HAS NOT RELEASED DETOUR INFORMATION FOR THIS CLOSURE. NO DETOUR INFORMATION HAS BEEN POSTED ON HAMILTON.CA, NOR HAS THE CITY RESPONDED TO EMAIL OR PHONE REQUESTS FOR THIS INFORMATION.

THE BELOW INFORMATION IS FROM THE PREVIOUS DETOUR FOR THE IDENTICAL CLOSURE.

The route detours are as follows below:

21 UPPER KENILWORTH no Longer Servicing Mohawk 4 Ice Centre

21 UPPER KENILWORTH bus at Mohawk 4 Ice Centre on February 18th, 2014.

In February 2014, route 21 UPPER KENILWORTH was given a limited extension to the Mohawk 4 Ice Centre on Mountain Brow Blvd. The extension ran on Tuesdays & Thursdays only, and only on the trip which ordinarily arrived at the Mountain Brow Loop at 7:45am. This change was not added to the timetable.

The planning department had this to say about the extension. “When it was originally put in, it was to help Sherwood students get to a hockey program at the arena. They did not need a ride home so the extension was helpful.”

The extension was stopped for the summer and was changed to on demand only for the fall and beyond. The HSR did not receive any more requests for additional trips to be extended, and the service has been discontinued.

No other HSR service is provided to Mohawk 4 Ice Centre.

James Mountain Road Closure December 13-14 Weekend Detours Routes 21/33/35

detour_small

Effective Saturday, December 13th, 2014 and Sunday, December 14th, 2014 from approximately 8:00AM to 6:00PM daily, James Mountain Road will be closed due to construction. As a result, routes 21 UPPER KENILWORTH, 33 SANATORIUM and 35 COLLEGE will be on detour during these times.

The route detours are as follows below:

James Mountain Road Closure This Weekend Detours Routes 21/33/35

detour_small

Effective Saturday, October 18, 2014 and Sunday, October 19, 2014 from approximately 7:00 AM to 8:00 PM daily, James Mountain Road will be closed due to construction. As a result, routes 21 UPPER KENILWORTH, 33 SANATORIUM and 35 COLLEGE will be on detour during these times.

The route detours are as follows below:

21 UPPER KENILWORTH extended Beginning February 18th

Effective Tuesday, February 18th route 21 UPPER KENILWORTH will be extended to Mohawk 4 Ice Centre on Tuesday & Thursdays. Only the trip which ordinarily arrives at the Mountain Brow Loop at 7:45am is affected.

This extension will be in effect until further notice.